Dorset system update 20/07/11
The equipment housings mentioned earlier are almost ready to go. Only the electrical switchgear needs to be fitted.
These are shots of the larger box, which houses the U/V unit and the heater unit. All water pumps and other items can be disconnected if needed by way of the union valves.
Again, the box has exactly the same depth as an Eric unit and these will be fitted with a shoebox-style lid to keep them readily accessible but totally weatherproof.
The beauty of these housings is that they can be prepared in advance and simply connected to the specific pipelines required. It certainly wins hands down on building concrete boxes and getting the lines through the walls before rendering etc. and then having to make a cover for them!