Update 24/05/10
More shots showing different stages of pond base from hardcore then re-bar after some lines have been laid underneath.
The first base poured, levelled and left for some days to cure.
Four custom drains and pipelines set in position.
Preparation of timbers in readiness for second concrete base, the filters to be placed on concrete base to be formed near to the yellow bucket.
Pond walls should be finished by 25/05
After this, the base for the filter units will be excavated and prepared which will then allow Ian Miles to proceed with his part of the installation.
Rendering and benching is planned for completion by 29/05/12 and if this heat wave lasts, the glass work will commence 11/06/12.
More soon, Waddy.