Update 03/11/12
Second base cast, pond ready for rendering after surface skimmers have been installed –
Rendering commences, first scratch coat –
Facing bricks to exposed wall –
Base for filters and equipment housing –
Eric Four unit, two of these will be used as sole filtration on the pond –
The final trowel finish has been applied to the render; once the pond base has been benched correctly then the pond will be covered and left to dry before the glass fibre is applied.
More soon.